A natural gas cycling plant in Erzin.
Contractor:
Akenerji and Gama Power Systems
Project Completion:
2013
Project Features:
1200mm dia intake pipe and 1000mm HDPE discharge pipe
We provided Gama Power Systems with marine engineering design and consultancy services for the cooling water systems at Erzin CCGT Power Plant. ARTI Proje designed all the components for the seawater intake / discharge system.
During the construction of the project, we additionally provided construction consultancy as part of our scope of services to the client. Inclusive of the hydraulic and dilution analyses in Erzin, all the structural designs and technical documentations and specifications were prepared by our company.